The Press Building

The Press Building

The Press Building NEAR NET ZERO ENERGY/CARBON – NO FOSSIL FUELS Year: 2008 Location: Exhibition Place, Toronto, Ontario The first historical building Geoxchange retrofit in...
CANNINGTON COMMONS

CANNINGTON COMMONS

CANNINGTON COMMONS Location: Cannington, Ontario Year: 2012 Main Features: NZEB BUILDING GFA: 2186m2 Modeled TEUI: 55.7 kWh/m2 Designed to meet passive house standards Design Features: Geoexchange heating and Cooling, Solar PV Ventilation energy recovery Mechanical,...
THE METRUS BUILDING (1987)

THE METRUS BUILDING (1987)

THE METRUS BUILDING (1987) 1987 NO FOSSIL FUELS Location: Concord, Ontario. Gross Floor area: 35,000 ft2 (3253 m2) Occupancy: Police station – 50% of ground floor (24hr operation) TD Bank – 50% of ground floor Second floor – Offices The geo system...
EMIRATES AIR LINES – TRIPLE 747 SERVICE FACILITY

EMIRATES AIR LINES – TRIPLE 747 SERVICE FACILITY

EMIRATES AIR LINES – TRIPLE 747 SERVICE FACILITY EMIRATES AIR LINES – TRIPLE 747 SERVICE FACILITY WAS THE ONLY FACILITY THAT COULD HANDLE BOEING 747 AIRCRAFT COMPLETED 1997 OUR LARGEST CONVENTIONAL PROJECT (NO FOSSIL FUELS) Location: Dubai, UAE In 1996 R....
Millardair Hangar

Millardair Hangar

Millardair Hangar Year: 1998 Location: Pearson International Mississauga, ON MILLARDAIR HANGAR AIR TRANSAT EXPANSION This facility was expanded to enable servicing of larger aircraft for Air Transat in 1998. RMA provided design of the heating system using high...